A - Field 5

Bid Service Overview:

Requested Bid Services Phase A: Field 5 

  • Design and install a temporary air-supported structure (dome / bubble) including the installation of all HVAC units, duct work, backup generator units, interior lighting, revolving door, and air lock building entryways for vehicles.  
  • Design consideration to affix anchor beam to top portion of box suites from Field 6 to permit additional spectator viewing. 
  • Remove existing concrete footing adjacent to the building. 
  • Resurface and expand a new concrete walking path from main entrance to Field 6, properly sloped for water runoff from building. 
  • Install concrete grade beam to support temporary air-supported structure in accordance with vendor requirements. 
  • Run electrical conduit from northwest section of indoor facility to field 5 with sufficient load capacity for outdoor LED lighting, special events (concerts) and temporary air-supported structure mechanisms including unit back-up generators. 
  • Repurpose the 8’ high chain link fence from east section of Field 6 to enclose Field 5 to Main Entrance.  
  • Removal of existing pine trees adjacent to building and border of parking lot. 
  • Resurface and grade site in accordance to master drainage plan. 
  • Install French drain around perimeter of synthetic turf connected to the main facility drainage system, accommodating water runoff, including snow loads, when air-supported structure is operational. 

 

  • Construct a code approved, elevated load bearing steel platform to meet and exceed repositioning the existing HVAC unit while accommodating new units, including backup generators for temporary air supported structure. 
  • Reposition and elevate existing HVAC unit to accommodate concrete pedestrian walkway. 
  • Refit HVAC duct work to exterior of building. 
  • Upgrade and recondition HVAC units. 
  • Construct a code approved, elevated load bearing steel platform to meet and exceed repositioning the existing HVAC unit while accommodating new units, including backup generators for temporary air supported structure. 
  • Reposition and elevate existing HVAC unit to accommodate concrete pedestrian walkway. 
  • Refit HVAC duct work to exterior of building. 
  • Upgrade and recondition HVAC units. 
  • Reposition existing gas line on south HVAC unit and fit a new gas line for the temporary air-supported structure HVAC units.  
  • Design and install a synthetic turf field with inlaid soccer lines for small-sided soccer fields (9v9 & 7v7) taking into consideration drainage must accommodate a temporary air-supported structure during winter months.